Tag

Load Takedown

3 posts tagged “Load Takedown”.

Workflow & tools

Load Takedown for a Change of Use

Turning an office into flats, a shop into a gym or a house into a clinic changes the imposed load. Here is how to rerun the takedown and what to check.

Sam Rivera··10 min
Load paths

CLT and Timber Frame Load Takedowns

The method is the same, the proportions are not. Timber self-weight is a quarter of concrete, so live load dominates and connections govern.

Sam Rivera··12 min
Workflow & tools

Load Takedown for a Vertical Extension, Run Twice

Adding storeys is a takedown run twice: existing loads versus found reserves, new storeys versus old footings. The workflow that decides what a building buys.

Elena Marchetti··10 min

← All posts